... High Performance Computing Steering Committee > HPC Steering Committee > MeetingNotes20090922 help
HPC Steering Committee HPC Steering Committee (permalink)
MeetingNotes20090922 (permalink)
last edited by Brandon Leeds on Friday, 10/23/2009 10:15 AM

Attendees - Brian Davison, Ted Ralphs, Bruce Dodson, Meghanad Wagh, David Myers, Ben Felzer, Gale Fritsche, Steve Lidie, Liangjie Hong, Brandon Leeds (minutes)

Excused - 

Agenda

  • Opening Remarks -- Brian and Ted
  • Budget for 2009-2010 - Gale/Brian/Ted
Gale handed out budget outlines for review. Discussion included concern for linux workstation refreshes every 3 years and money that is used for those machines.
  • Outreach and Education
1- Planning cycle for HPC Day 2010 - Brandon
Reviewed planning document that was created at end of last years HPC Day activities to be used specifically for this year's event planning.
2- Status of web page format updates to match LTS - Brandon
Reviewed currnet web look and feel. Went over Liangjie's attempt at conforming to the proposed format and discussed problems that were encountered and various drabacks, which included rollover menus, lack of space in which to present a lot of information on each page, and the lack of overall acceptance campus wide of the "standard". A decision was made to table adoption of that standard until such time that more of a concensus was reahed on campus as to what a common look and feel should be.
  • Future Systems
1- Broad discussion of what kinds of plans do we want for future systems - Ted/Brian
Not gotten to.
  • Strategic Planning
1- Computational Engineering and Science workshop - Oct 5-6 - Brian
Brian discussed the workshop and recommended members attend if possible.
2- Strategic planning for scientific computing at the university - Ted
 Not gotten to.
  • Policies and Procedures
1. Status of high-resource usage accounts? - Gale/Steve L.
  • Operations
1- Status update of availability and use of new systems - Steve L.
 Policy page on HPC pages has information on the cost of renting these machines but not an automate form of how to request this yet. Those interested are directed to contact Brandon.
2- Report on AC problems causing significant inferno outages - Steve L./Gale
Steve said we need to speak to Steve Roseman for accurate details but there is a need for increased capacity on very hot days which caused clusters to casue hotspots in machine room that could only be addressed by shutting off cluster nodes.
3- Status of Abaqus under Condor - Brandon/Liangjie
Report given on current status. Nothing has changed. Current solution is to provide Dr. Roy Inferno nodes on an as needed basis.
Footer with links to learningObjects information
${initParam.pluginShortName}
About | Feedback | Instructor Resources
Powered by Learning Objects, Inc., Copyright © 2003-2008
Page
Links to Create,Edit,Delete,Print and View History of Wikis
Page Stats
Views: 215
Edits: 12
Contributors: 2
Comments: 0
Toolbox
Site Navigation links